HOWO 10000L 4x2 Fuel Tank Truck for Diesel and Oil Transport
| MOQ: | 1 Piece |
| Price: | Negotiable |
| Standard Packaging: | Nude Packing |
| Delivery Period: | 30 work days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 3000 Per Month |
Product Description
HOWO 10000L 4x2 Fuel Tank Truck is designed for the safe and efficient transportation and delivery of diesel, gasoline and other liquid fuels. Built on a reliable HOWO 4x2 truck chassis, it features a 10,000-liter fuel tank with a practical configuration for fuel distribution, construction sites, mining operations and commercial fuel supply. The truck offers good maneuverability, reliable performance and easy maintenance, making it suitable for African markets and various road conditions.
Production Parameter
| Item | Specification |
| Brand | HOWO |
| Vehicle Type | 4×2 Fuel Tank Truck |
| Model | ZZ1127G4715C1 |
| Cabin | 2080 Flat Roof Semi Cab with A/C |
| Engine | YUCHAI YC4E160-33 |
| Engine Power | 160 HP |
| Emission Standard | Euro III |
| Transmission | HW90510C, 10-Speed Manual Transmission with PTO |
| Wheelbase | 4,700 mm |
| Front Axle | 3.6 Ton |
| Rear Axle | 10 Ton |
| Rear Axle Ratio | 6.5 |
| Tire | 9.00R20 16PR |
| Frame | 25D865 |
| Suspension | 9/12 + 9H |
| Fuel Tank | 220 L |
| Tank Capacity | 10,000 L |
| Tank Effective Volume | 10,000 L |
| Tank Material | Q235 Carbon Steel |
| Tank Structure | Elliptical Tank, Single Compartment |
| Tank Head Thickness | 4 mm |
| Tank Shell Thickness | 4 mm |
| Internal Baffles | Equipped |
| Manhole Cover | 1 Set Aluminum Alloy EU Standard Explosion-Proof Manhole Cover |
| Subsea Valve | 1 Set |
| Pipe Cabinet | Equipped |
| Oil Delivery Hose | 2 Pcs |
| Fire Extinguisher Cap | 1 Pc |
| Fire Extinguishers | 2 Pcs Dry Powder Fire Extinguishers |
| Grounding System | Grounding Wire and Static Grounding Stake |
| Fuel Pump | Equipped |
| Pump Oil Inlet | Equipped |
| Pump Oil Outlet | Equipped |
| Gravity Oil Discharge | Equipped |
| Flow Meter | 1 Resettable Flow Meter |
| Metering System | High-Pressure Oil Outlet Can Pass Through Flow Meter for Metering |
| Tank Access | Folding Handrails and Tank Access Ladder |
| Fuel Dispenser | Beijing Jialijia Fuel Dispenser, Export English Version |
| Dispenser Capacity | 70 L/min |
| Receipt Printing | Built-in Receipt Printing Function |
| Fuel Hose Reel | 1 Set, 10 m × 1 inch |
| Fuel Nozzle | 1 Pc |
| Surface Treatment | Whole Vehicle Wax Spraying |
| Other Accessories | Standard Fuel Tanker Accessories |
Production Details
![]()
Successful Case
![]()
Shipping
![]()
FAQ
Q1:Erection/commissioning/training
A:1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker- team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller will send 2 persons to guiding erection in the buyer's working site, and training operators for the buyer.
3) The buyer will bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD150/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 30-35 working days.
Q2:What payment options do you accept?
A:We accept both Telegraphic Transfer(T/T) and Letter of Credit (LC),providing you with flexibility and convenience.
Q3: What kind of after-sales services do you offer?
A:Our after-sales services are second to none,as we offer technical support and provide spare parts to ensure the long lifespan of our products.
Q4: How do you deliver spare parts?
A:You can rely on us to deliver the spare parts you need through trusted shipping methods such as DHL,UPS,orFedEx.
Q5: What shipping options do you provide?
A:Shipping your order is hassle-free with ourvarious options.We use container,flat rack container, Roll-on/Roll-off (Roro) vessel,and bulk vessel for shipping,ensuring yourproducts are delivered safely and efficiently.
Q6: What is the delivery time for your products?
A:Delivery time ranges from 7 to 60 days after receiving the deposit,giving you a clearidea of when to expect yourorder. Rest assured,we strive to deliver your products in a timely manner.